Details
Description
Given a scenario with pending steps
Given I choose to break the build on pending steps
When I run the scenario
Then my build should break
Activity

Field | Original Value | New Value |
---|---|---|
Component/s | Core [ 11086 ] |

Fix Version/s | 2.0 [ 14456 ] |

Assignee | Elizabeth Keogh [ sirenian ] |

Resolution | Fixed [ 1 ] | |
Status | Open [ 1 ] | Closed [ 6 ] |
Can be done either by specifying the strategy as part of the configuration, or by setting the System property -Dorg.jbehave.failonpending to something non-null.